Successful Operations of Commissioning and Start-Up in Industrial Electrical Service
What Is Commissioning?
Definition and Objective
Commissioning
involves the systematic process of ensuring that every industrial electrical
system and component is installed, tested, and operational for their full
installed system functions so that they meet the design specifications and
operational requirements. In this regard, at which the system is fully
integrated into an operating environment, commissioning has the overall
objective of ensuring that the system functions safely, reliably, and
efficiently.
Main Objectives
The instructions are:
Installation Verification: Electrical systems and
components were installed per engineering specifications and drawings.
Functional Testing: Verifying the ability
of the systems to operate with any load and condition is termed functional
testing.
Safety Provision: Making sure that all
safety precautions and emergency systems are in place and are working is termed
safety provision.
Optimization: Problems are found and corrected, and
whether the system can be improved in performance and reliability is checked.
What Is Start-Up?
Definition and Purpose
The initial
application of power to an electrical installation to ensure that all
elements operate as designed in application is the phase of the process beyond
commissioning. During this phase of a project, power is progressively applied
while observing system performance to discover any operational problems.
Primary Objectives
Progressive Power-Up: An incremental
application of power to a system is not performed as a means of supplying
unsupplied load conditions nor for the purpose of stability.
Performance Monitoring: This would involve
observing how the system behaves whenever it is at work, particularly during
tests of load or performance assessments.
Anomaly Handling: The finding of
anomalies that may appear and fixing them in the process of starting up the
system
Full Record: Complete all reporting and documentation so that the system meets all operational and legal requirements.
Commissioning and Start-Up Procedure
1. Arrangements
and preparation
2. Inspection and Verification
3. Preliminaries
4. Completion and Handover
Conclusion
Commissioning and start-up of the deployment process ensure that the Advanced Process Control Basics of industrial electrical systems are built, tested, and operationally ready. Since it is a fact that effective commissioning and setup could be attained with careful planning, testing, and documentation, it is highly likely that industrial facilities can attain reliable, efficient, and safe electrical system operations. In these stages, best practices beyond the functionality of the operating system are closely related to long-term operational success and safety.